Hello,
Less than a year ago I bought a H3 12kw 3-phase inverter along with 8x Mira HV25 batteries (19kwh)
I now want to increase the battery storage but apparently the H3 only has one battery input and you can't stack Mira BMS units.
I have been given the following proposal from the installer.
- Buy a new H3 Pro 15kw to replace the H3 (Due to physical space limitations I can only have one inverter)
- Run my existing Mira HV25 (19kwh) on the one battery input
- Buy an EP12 (11.5kwh) battery and run that on the second battery input
The primary reason is the access and stock to the Mira HV25 locally is a major challenge.
I understand they both high voltage but are there any caveats or concerns in running such a setup?