Kh9.9 string cap?
Posted: Mon Aug 10, 2026 4:21 am
Hi all question.
Have 10.8kw qcell panels installed 2022 with fronius 8kw single ph inverter.
2026 added foxess 42kw eq4800 with kh9.9 single ph inverter. Fronius inverter removed
26 panels east/west orientation on 2 strings.
With the old smaller inverter same time last year i was getting 7.2kw solar production now only 6.5kw with newer larger inverter.
firmware master 1.6 slave 1.02 manager 1.58. read about a 3.3kw cap per string on fox inverter that should have been fixed with firmware update to 5kw.
Anyone else have this problem? Export cap is at 5kw but when I forcecharge battery at 10.9kw solar production stays at 6.5kw.
Any advice/settings changes would be appreciated
Have 10.8kw qcell panels installed 2022 with fronius 8kw single ph inverter.
2026 added foxess 42kw eq4800 with kh9.9 single ph inverter. Fronius inverter removed
26 panels east/west orientation on 2 strings.
With the old smaller inverter same time last year i was getting 7.2kw solar production now only 6.5kw with newer larger inverter.
firmware master 1.6 slave 1.02 manager 1.58. read about a 3.3kw cap per string on fox inverter that should have been fixed with firmware update to 5kw.
Anyone else have this problem? Export cap is at 5kw but when I forcecharge battery at 10.9kw solar production stays at 6.5kw.
Any advice/settings changes would be appreciated