Title: New to Fox ESS – KH9.9 + EQ4800 in SA, a few setup questions

Posted: Tue Nov 17, 2026 2:49 am
by fkabir
Hi everyone,

I've just moved into a rental in Mawson Lakes, SA that came with an existing Fox ESS system. I'm new to home batteries, so I'd really appreciate some help from people who know these systems.

My setup:
- Inverter: Fox ESS KH9.9 (single phase)
- Battery: EQ4800, 6 modules (about 28 kWh)
- Solar: about 10 kW
- Retailer: AGL Battery Rewards (26c/kWh feed-in from 5–9pm, 1c at other times; peak import 53c)

Current settings:
- Work mode: Self-use
- System SOC range: 10–100%, StormSafe Charging disabled
- Mode Scheduler: Forced Discharge 17:00–21:00, discharge power to grid 5000 W, cut-off SOC 30%, then Self-use, Discharge from PV on
- No Forced Charge periods, because I don't want to charge the battery from the grid

My questions:

1. Export limit: Quick Settings shows Export Limit 9.9 kW (greyed out, so I assume the installer set it). SA Power Networks says Flexible Exports is available at my address. How can I tell whether the system is actually on Flexible Exports or a fixed limit? Is it safe to raise the Forced Discharge power above 5000 W, or will the inverter enforce the network limit anyway?

2.If the logger goes offline, does the Mode Scheduler keep running on the inverter, and does it affect Flexible Exports?

3. Cut-off SOC: For anyone on a similar evening feed-in plan, what cut-off do you use to cover overnight usage until the solar picks up, without importing during the morning peak? In winter, do you raise the cut-off or turn off forced discharge on cloudy days?

Faz