Mode scheduler
Posted: Mon Sep 15, 2025 12:42 am
Hi, I’ve got an H1-6.0-E with the max 1p 17kWH of batteries and 18 x 415W PV panrels on 2 strings.
This has been installed and running fine for about a year. Been on Octopus Intelligent Go for the EVs and using the standard Force Charge Time settings.
I’ve now had a heat pump installed to replace my gas boiler and switched over to Cosy Octopus so I can run the pump continually on time shifted cheap electricity, but of course I now need to force battery charging 3 times a day.
I understand the way to do that is to use the Mode Schedule, but that option is greyed out in the Fox ESS app, and when I try to select it, it says ‘not supported’
Before I go bug my installer, is there a way to enable it on my inverter? Does it need a firmware upgrade? Is it just not possible on this model?
Thanks
Mark
This has been installed and running fine for about a year. Been on Octopus Intelligent Go for the EVs and using the standard Force Charge Time settings.
I’ve now had a heat pump installed to replace my gas boiler and switched over to Cosy Octopus so I can run the pump continually on time shifted cheap electricity, but of course I now need to force battery charging 3 times a day.
I understand the way to do that is to use the Mode Schedule, but that option is greyed out in the Fox ESS app, and when I try to select it, it says ‘not supported’
Before I go bug my installer, is there a way to enable it on my inverter? Does it need a firmware upgrade? Is it just not possible on this model?
Thanks
Mark